SCOTT AIR FORCE BASE
St. Clair County, Illinois
In September 2007 as part of the Department of Defense’s Utility Privatization Program, we were awarded ownership and a 50-year contract for the operations and maintenance of the water distribution and treatment facilities at Scott Air Force Base in St. Clair County, Illinois.
Our responsibilities include system capital investment, regulatory and environmental compliance, planning, asset recapitalization, and long-term operations and maintenance. The water system serves a population of approximately 15,000 and supplies water for over 1,541 facilities and housing units.
There are approximately 70 miles of pipe mains ranging from 4 to 14 inches in diameter. The system includes valves, fire hydrants, meters, and 5 storage tanks with a total water storage capacity of 2.2 million gallons. In addition, three facilities on base provide supplemental water treatment (chlorination and ammonia or caustic feed).
VENDOR INFORMATION AND FORMS
STANDARD SPECIFICATIONS
Division 1 - General Requirements
Division 3 - Concrete
- 03 30 00 - Cast-In-Place Concrete
- 03 48 10 - Precast Concrete Manholes
- 03 48 20 - Valve Boxes and Meter Vaults
- 03 90 00 - Manhole Rehabilitation
Division 5 - Metals
Division 9 - Finishes
Division 22 - Plumbing
- 22 11 16.11 - Water Tap and Service Installation
- 22 11 16.13 - Cross Connection Control
- 22 13 19.23 - Grease Traps
- 22 13 20 - Oil/Water Separator
Division 25 - Integrated Automation
Division 26 - Electrical
- 26 00 10 - General Electrical Requirements
- 26 00 20 - Electrical Materials and Methods
- 26 29 33 - Variable Frequency Drives
- 26 32 13.13 - Emergency Generator
- 26 36 23 - Automatic Transfer Switch
Division 31 - Earthwork
- 31 11 00 - Clearing and Grubbing
- 31 23 23 - Utility Backfill Materials
- 31 23 33 - Excavation Backfill and Compaction for Utilities
- 31 50 00 - Casing Installation
Division 32 - Exterior Improvements
- 32 01 00 - Pavement Repair and Restoration
- 32 13 13 - Concrete Curb, Drives and Sidewalks
- 32 92 00 - Turf and Grasses
Division 33 - Utilities
- 33 01 10.13 - Pressure and Leakage Tests
- 33 01 10.15 - Disinfecting Pipeline
- 33 01 30.13 - Acceptance Testing for Sanitary Sewers
- 33 01 30.51 - Pumping and Bypassing
- 33 05 23.13 - Horizontal Directional Drilling
- 33 05 27 - Tracer Wire
- 33 05 29.11 - Stream Crossing
- 33 05 29.13 - Bridge Crossing
- 33 11 00 - Piping and Accessories - General Provisions
- 33 11 00.11 - Polyvinyl Chloride (PVC) Pipe
- 33 11 00.13 - High Density Polyethylene (HDPE) Pipe
- 33 11 00.15 - Ductile Iron Pipe and Fittings
- 33 11 00.17 - Polyethylene Wrap
- 33 11 00.19 - Abandonment of Water Mains
- 33 11 00.21 - Cured-In-Place Pipe
- 33 12 16.11 - Gate Valves
- 33 12 16.13 - Butterfly Valves
- 33 12 16.15 - Pressure Reducing Valves
- 33 12 16.17 - Tapping Sleeves and Valves
- 33 12 16.19 - Air Release Valves
- 33 12 19 - Fire Hydrants
- 33 12 33 - Water Meters
- 33 16 13 - Ground Storage Tanks
- 33 16 13.11 - Water Storage Tank Disinfection
- 33 16 13.12 - Water Storage Tank Removal
- 33 21 00 - Drinking Water Well Requirements
- 33 31 00.11 - Gravity Sanitary Sewers
- 33 31 00.13 - Abandonment of Sewer Mains
- 33 31 00.15 - Sanitary Sewer Laterals
- 33 32 16 - Packaged Sanitary Lift Stations
- 33 32 16.15 - Medium Sized Lift Stations
- 33 32 17 - Grinder Lift Stations
- 33 34 00 - Sanitary Sewer Force Mains
STANDARD DETAILS
- MSG-ST-01 - General Water and Sewer Construction Notes (1 of 2)
- MSG-ST-01A - General Water and Sewer Construction Notes (2 of 2)
- MSG-ST-02 - Trench Restoration
- MSG-ST-03 - Jack and Bore Detail
- MGS-ST-04 - Electrical Safety
- MSG-ST-05 - Required Separation between Water Mains and Sanitary Sewers
- MSG-ST-06 - Chain-Link Fence
- MSG-ST-07 - Concrete Encasement Detail
Wastewater
- MSG-WW-01 - Standard Small Lift Station Detail
- MSG-WW-02 - Standard Small Lift Station Electrical Plan
- MSG-WW-03 - Pump Station Details
- MSG-WW-04 - Emergency Pump Connection Detail
- MSG-WW-05 - Standard Medium Lift Station Typical Layout Detail
- MSG-WW-06 - (RESERVED)
- MSG-WW-07 - Clean Out Detail
- MSG-WW-08 - (RESERVED)
- MSG-WW-09 - Standard Precast Manhole Detail
- MSG-WW-10 - Typical Outside Drop Connection Detail
- MSG-WW-11 - Doghouse Manhole Detail
- MSG-WW-12 - Connection to Existing Manhole Detail
- MSG-WW-13 - Manhole Steps Detail
- MSG-WW-14 - Manhole Frame and Cover Detail
- MSG-WW-15 - Manhole Vent
- MSG-WW-16 - Sanitary Sewer Lateral Detail
- MSG-WW-17 ( RESERVED)
- MSG-WW-18 - Force Main Discharge Manhole
- MSG-WW-19 - Force Main Cleanout
- MSG-WW-19A - Force Main Dual Cleanout Detail
- MSG-WW-20 - Sewage Air Release Valve
- MSG-WW-21 - Grease Trap
Water
- MSG-W-01 - Water Service Installation for 2" Meters
- MSG-W-01A - Water Service Installation for Smaller than 2" Meters
- MSG-W-02 - Shallow Bury Air Release Valve Assembly Detail
- MSG-W-03 - Gate Valve Box Pad Detail
- MSG-W-04 - Concrete Valve Box Pad Detail
- MSG-W-05 - Tracer Wire for Non-Conductive Pipe Detail
- MSG-W-06 - Tapping Sleeve and Valve Detail
- MSG-W-07 - Fire Hydrant Detail
- MSG-W-08 - Thrust Block Details
- MSG-W-09 - 3" and Larger Meter Vault Detail
- MSG-W-10 - Fire Hydrant Construction Meter Detail
- MSG-W-11 -Yard Hydrant
- MSG-W-12 - (RESERVED)
- MSG-W-13 - Cutting-In Sleeve and Valve Installation Detail
- MSG-W-14 - Concrete Blocking Pad Detail
- MSG-W-15 - Blow-off Assembly Detail
- MSG-W-16 - Automatic Flushing Assembly Detail
- MSG-W-17 - 3/4"-2" DC Backflow Preventer - Exterior
- MSG-W-18 - 2" DC Backflow Preventer - Exterior
- MSG-W-19 - 3/4" - 2" DC Backflow Preventer - Interior
- MSG-W-20 - 2" DC Backflow Preventer - Interior
- MSG-W-21 - 3/4"-2" RPZ Backflow Preventer - Exterior
- MSG-W-22 - 2" RPZ Backflow Preventer - Exterior
- MSG-W-23 - 3/4" - 2" RPZ Backflow Preventer - Interior
- MSG-W-24 - 2" RPZ Backflow Preventer - Interior
- MSG-W-25A-HDPE Connection Restraints
- MSG-W-25B-HDPE Connection Restraints
- MSG-W-29- Above Ground Sampling Station
DESIGN GUIDE
Military Services Group Design Guide
STANDARD SPECIFICATIONS AND DETAILS REVISIONS LOG
ADDITIONAL DOCUMENTS
To contact Scott Air Force Base administrator or Project Manager, please email Scott.AFB@amwater.com or contact 618-744-9631.