WRIGHT-PATTERSON AIR FORCE BASE
Dayton, Ohio
In September 2017, we were awarded a 50 year contract to own and operate the water distribution and wastewater collection systems at Wright-Patterson Air Force Base, OH, as part of the Department of Defense’s Utility Privatization Program.
Our responsibilities include system capital investment, regulatory and environmental compliance, and long-term operations and maintenance. The water and wastewater systems serve a population numbering approximately 27,000 people who live and work on the base.
The water system contains approximately 100 miles of pipe, over 750 hydrants, 14 storage tanks, and several wells and pump stations, and. The wastewater system contains over 50 miles of pipe, 27 lift stations, and over 1,000 manholes.
VENDOR INFORMATION AND FORMS
STANDARD SPECIFICATIONS
Division 1 - General Requirements
Division 3 - Concrete
- 03 30 00 - Cast-In-Place Concrete
- 03 48 10 - Precast Concrete Manholes
- 03 48 20 - Valve Boxes and Meter Vaults
- 03 90 00 - Manhole Rehabilitation
Division 5 - Metals
Division 9 - Finishes
Division 22 - Plumbing
- 22 11 16.11 - Water Tap and Service Installation
- 22 11 16.13 - Cross Connection Control
- 22 13 19.23 - Grease Traps
- 22 13 20 - Oil/Water Separator
Division 26 - Electrical
- 26 00 10 - General Electrical Requirements
- 26 00 20 - Electrical Materials and Methods
- 26 29 33 - Variable Frequency Drives
- 26 32 13.13 - Emergency Generator
- 26 36 23 - Automatic Transfer Switch
Division 31 - Earthwork
- 31 11 00 - Clearing and Grubbing
- 31 23 23 - Utility Backfill Materials
- 31 23 33 - Excavation and Backfill for Utilities
- 31 50 00 - Casing Installation
Division 32 - Exterior Improvements
- 32 01 00 - Pavement Repair and Restoration
- 32 13 13 - Concrete Curb, Drives and Sidewalks
- 32 92 00 - Turf and Grasses
Division 33 - Utilities
- 33 01 10.13 - Pressure and Leakage Tests
- 33 01 10.15 - Disinfecting Pipeline
- 33 01 30.13 - Acceptance Testing for Sanitary Sewers
- 33 01 30.51 - Pumping and Bypassing
- 33 05 23.13 - Horizontal Directional Drilling
- 33 05 27 - Tracer Wire
- 33 05 29.11 - Stream Crossing
- 33 05 29.13 - Bridge Crossing
- 33 11 00 - Piping and Accessories - General Provisions
- 33 11 00.11 - Polyvinyl Chloride (PVC) Pipe
- 33 11 00.13 - High Density Polyethylene (HDPE) Pipe
- 33 11 00.15 - Ductile Iron Pipe and Fittings
- 33 11 00.17 - Polyethylene Wrap
- 33 11 00.19 - Abandonment of Water Mains
- 33 11 00.21 - Cured-In-Place Pipe
- 33 12 16.11 - Gate Valves
- 33 12 16.13 - Butterfly Valves
- 33 12 16.15 - Pressure Reducing Valves
- 33 12 16.17 - Tapping Sleeves and Valves
- 33 12 16.19 - Air Release Valves
- 33 12 19 - Fire Hydrants
- 33 12 33 - Water Meters
- 33 16 13 - Ground Storage Tanks
- 33 16 13.11 - Water Storage Tank Disinfection
- 33 16 13.12 - Water Storage Tank Removal
- 33 21 00 - Drinking Water Well Requirements
- 33 31 00.11 - Gravity Sanitary Sewers
- 33 31 00.13 - Abandonment of Sewer Mains
- 33 31 00.15 - Sanitary Sewer Laterals
- 33 32 16 - Packaged Sanitary Lift Stations
- 33 32 16.15 - Medium Sized Lift Stations
- 33 32 17 - Grinder Lift Stations
- 33 34 00 - Sanitary Sewer Force Mains
STANDARD DETAILS
- MSG-ST-01 - General Water and Sewer Construction Notes (1 of 2)
- MSG-ST-01A - General Water and Sewer Construction Notes (2 of 2)
- MSG-ST-02 - Trench Restoration
- MSG-ST-03 - Jack and Bore Detail
- MGS-ST-04 - Electrical Safety
- MSG-ST-05 - Required Separation between Water Mains and Sanitary Sewers
- MSG-ST-06 - Chain-Link Fence
- MSG-ST-07 - Concrete Encasement Detail
Wastewater
- MSG-WW-01 - Standard Small Lift Station Detail
- MSG-WW-02 - Standard Small Lift Station Electrical Plan
- MSG-WW-03 - Pump Station Details
- MSG-WW-04 - Emergency Pump Connection Detail
- MSG-WW-05 - Standard Medium Lift Station Typical Layout Detail
- MSG-WW-06 - (RESERVED)
- MSG-WW-07 - Clean Out Detail
- MSG-WW-08 - (RESERVED)
- MSG-WW-09 - Standard Precast Manhole Detail
- MSG-WW-10 - Typical Outside Drop Connection Detail
- MSG-WW-11 - Doghouse Manhole Detail
- MSG-WW-12 - Connection to Existing Manhole Detail
- MSG-WW-13 - Manhole Steps Detail
- MSG-WW-14 - Manhole Frame and Cover Detail
- MSG-WW-15 - Manhole Vent
- MSG-WW-16 - Sanitary Sewer Lateral Detail
- MSG-WW-17 ( RESERVED)
- MSG-WW-18 - Force Main Discharge Manhole
- MSG-WW-19 - Force Main Cleanout
- MSG-WW-19A-Force Main Dual Cleanout Detail
- MSG-WW-20 - Sewage Air Release Valve
- MSG-WW-21 - Grease Trap
Water
- MSG-W-01 - Water Service Installation for 2" Meters
- MSG-W-01A - Water Service Installation for Smaller than 2" Meters
- MSG-W-02 - Shallow Bury Air Release Valve Assembly Detail
- MSG-W-03 - Gate Valve Box Pad Detail
- MSG-W-04 - Concrete Valve Box Pad Detail
- MSG-W-05 - Tracer Wire for Non-Conductive Pipe Detail
- MSG-W-06 - Tapping Sleeve and Valve Detail
- MSG-W-07 - Fire Hydrant Detail
- MSG-W-08 - Thrust Block Details
- MSG-W-09 - 3" and Larger Meter Vault Detail
- MSG-W-10 - Fire Hydrant Construction Meter Detail
- MSG-W-11 -Yard Hydrant
- MSG-W-12 - (RESERVED)
- MSG-W-13 - Cutting-In Sleeve and Valve Installation Detail
- MSG-W-14 - Concrete Blocking Pad Detail
- MSG-W-15 - Blow-off Assembly Detail
- MSG-W-16 - Automatic Flushing Assembly Detail
- MSG-W-17 - 3/4"-2" DC Backflow Preventer - Exterior
- MSG-W-18 - > 2" DC Backflow Preventer - Exterior
- MSG-W-19 - 3/4" - 2" DC Backflow Preventer - Interior
- MSG-W-20 - > 2" DC Backflow Preventer - Interior
- MSG-W-21 - 3/4"-2" RPZ Backflow Preventer - Exterior
- MSG-W-22 - > 2" RPZ Backflow Preventer - Exterior
- MSG-W-23 - 3/4" - 2" RPZ Backflow Preventer - Interior
- MSG-W-24 - > 2" RPZ Backflow Preventer - Interior
- MSG-W-25A-HDPE Connection Restraints
- MSG-W-25B-HDPE Connection Restraints
- MSG-W-29- Above Ground Sampling Station
DESIGN GUIDE
Military Services Group Design Guide (Jan 2023)
STANDARD SPECIFICATIONS AND DETAILS REVISIONS LOG
2023 Revision Log (current as of Jan 2023)
ADDITIONAL DOCUMENTS
To contact Wright-Patterson Air Force Base administrator or Project Manager, please email Wright.PattersonAFB@amwater.com or contact 254-213-0382.